Connecticut DOT schedules virtual meeting on Waterford bridge replacement

Elizabeth Keyes, Chief of Legal and Regulatory Affairs - Connecticut Department of Transportation
Elizabeth Keyes, Chief of Legal and Regulatory Affairs - Connecticut Department of Transportation
0Comments

The Connecticut Department of Transportation (CTDOT) is set to hold a virtual public information meeting regarding the replacement of Bridge No. 05999, which carries Route 85 over Jordan Brook in Waterford. The meeting is scheduled for Thursday, June 12, 2025, at 6:30 p.m.

This meeting aims to provide an opportunity for the public and local community to offer comments or ask questions about the proposed project. It will be conducted on Zoom, requiring prior registration. A question and answer session will follow the presentation, which will be recorded. Details on accessing the meeting and submitting comments can be found at https://portal.ct.gov/DOTWaterford0152-0162.

“The replacement of the culvert will improve traveler safety over Jordan Brook while considering the future travel needs of the community, such as increased accommodations for bicyclists and pedestrians,” stated Francisco Fadul, Project Manager at CTDOT.

The project involves right-of-way impacts, including partial takes and easements. Construction is expected to start in spring 2028, contingent upon funding availability, acquisition of rights of way, and permit approvals. The estimated construction cost is approximately $5 million, with funding anticipated to come from 80% federal funds and 20% state funds.

For those with limited internet access, listening options are available by calling (877) 853-5257 with Meeting ID 869 0661 7950. Telecommunications Relay Services are accessible by dialing 711 for individuals with hearing or speech disabilities. Additionally, project information can be mailed upon request by contacting Francisco Fadul at Francisco.Fadul@ct.gov or (860) 594-2078.

Language assistance can be requested through the CTDOT Language Assistance Call Line at (860) 594-2109 at least five business days before the meeting. This service is free of charge to the public.

Non-English language closed captioning will be provided on Zoom during the meeting. The recording will also be available later in CTDOT’s public meeting playlist online.

Public comments and questions can be submitted during a two-week period following the meeting until June 26, 2025. Submissions should reference Project No. 0152-0162 and can be sent via email to DOTProject0152-0162@ct.gov or voicemail at (860) 594-2020.



Related

David X. Sullivan, Interim U.S. Attorney for the District of Connecticut - https://www.mccarter.com/

Waterbury man sentenced for leading local drug trafficking organization

Angel Quiros, also known as “Papa John,” has been sentenced to 63 months in federal prison for leading a drug trafficking organization in Waterbury.

David X. Sullivan, Interim U.S. Attorney for the District of Connecticut - https://www.mccarter.com/

Hartford man sentenced to three years for drug distribution and gun possession

A Hartford man has been sentenced to three years in federal prison for distributing oxycodone and possessing a firearm as a convicted felon.

Garrett Eucalitto, Commissioner - Connecticut Department of Transportation

Connecticut DOT schedules virtual meeting on I-91 bridge replacements in Enfield

The Connecticut Department of Transportation (CTDOT) will hold a virtual public information meeting on November 6, 2025, to discuss the replacement of two bridges over Interstate 91 in Enfield.

Trending

The Weekly Newsletter

Sign-up for the Weekly Newsletter from Constitution State News.